Suspended
Scaffolding
Platforms Outrigger
Systems
Masonry
Scaffolding
Material
Hoists
Debris
Chutes
Ladders Equipment Permanent
Installations
Other
Services
    Home >  Platforms >  Modular >  Sky Climber ULTRA Boiler Plaform
Modular
Non-modular

Sky Climber Ultra Boiler Platform

SSU BOILER PLATFORM FOLDS TO FIT

  • Through openings as small as 18” round
  • Transport a 40 foot platform (or larger) in the bed of your pick up truck
  • Use standard end stirrups or floating/moveable stirrup
  • Components unfold to provide full-size platform and performance
  • Workers set up a 20, 30 or 40 foot platform in 20 minutes
  • Load capacity to 1000 lbs.
  • Adjustable hand rails add versatility
  • Telescoping posts allow repositioning of hand rails
  • Available in work cages in various sizes
  • Meets or exceeds all OSHA and ANSI standards
  • UL Classified

The easy, fast, modular way to access those small, hard to reach places with a full-size work platform. Sky Stage Ultra Boiler Platform components fold to fit through openings as small as 18”. Stop paying high labor and erection costs for stack scaffolding. Use Sky Stage Ultra inside boilers, digesters, silos, and other hard to reach places. Two or three workers can install a 20 foot platform in about 20 minutes. Think of the savings you’ll realize using a modular system. Sky Climber offers Application and Safety training at your site. Call us for more information.

   


Sky Stage Ultra by Component
Description Part No. 2m 3m 4m 5m 6m 7m 8m 9m 10m 11m 12m

Side 3 meter Side
Boiler Version

361019 0 2 0 2 4 2 4 6 4 6 8

Side 2 meter Side
Boiler Version

361023 2 0 4 2 0 4 2 0 4 2 0

Side 1 meter Side
Boiler Version

361027 0 0 0 0 0 0 0 0 0 0 0

Floor 3 meter Floor
Boiler Version

361021 0 1 0 1 2 1 2 3 2 3 4

Floor 2 meter Floor
Boiler Version

361025 1 0 2 1 0 2 1 0 2 1 0

Floor 1 meter Floor
Boiler Version

361029 0 0 0 0 0 0 0 0 0 0 0

Top Rail 3 meter Top
Rail Boiler Version

361010 0 2 0 2 4 2 4 6 4 6 8

Top Rail 2 meter Top
Rail Boiler Version

361022 2 0 4 2 0 4 2 0 4 2 0

Top Rail 1 meter Top
Rail Boiler Version

361026 0 0 0 0 0 0 0 0 0 0 0

Connecting Frame
Boiler Version

361015 2 2 3 3 3 4 4 4 5 5 5

Telescoping Post
Boiler Version

361014 4 4 6 6 6 8 8 8 10 10 10

End Stirrup Boiler
Version

361011 2 2 2 2 2 2 2 2 2 2 2

Caster Assembly*

360065 4* 4* 4* 4* 4* 4* 4* 4* 4* 4* 4*

Wall Roller Assembly

360111 2 2 2 2 2 2 2 2 2 2 2

Safety Pin Assembly

360019 16 16 30 30 30 44 44 44 58 58

Adjustable Walk-By
Stirrup*

361030 variable*

End Gate Boiler
Version

361051 2* 2* 2* 2* 2* 2* 2* 2* 2* 2* 2*

Workcage - 1 meter

368000-W01

Workcage - 2 meter

368000-W01
*Optional Item - not included with Standard Stages