Sky Climber Ultra Boiler Platform
SSU BOILER PLATFORM FOLDS TO FIT
|
 |
-
Through openings as small as 18” round
-
Transport a 40 foot platform (or larger) in the bed of your pick up truck
-
Use standard end stirrups or floating/moveable stirrup
-
Components unfold to provide full-size platform and performance
-
Workers set up a 20, 30 or 40 foot platform in 20 minutes
-
Load capacity to 1000 lbs.
-
Adjustable hand rails add versatility
-
Telescoping posts allow repositioning of hand rails
-
Available in work cages in various sizes
-
Meets or exceeds all OSHA and ANSI standards
-
UL Classified
The easy, fast, modular way to access those small, hard to reach places with a full-size work platform. Sky Stage
Ultra Boiler Platform components fold to fit through openings as small as 18”. Stop paying high labor and erection
costs for stack scaffolding. Use Sky Stage Ultra inside boilers, digesters, silos, and other hard to reach places.
Two or three workers can install a 20 foot platform in about 20 minutes. Think of the savings you’ll realize using a
modular system. Sky Climber offers Application and Safety training at your site. Call us for more information.
Sky Stage Ultra by Component
| Description |
Part No. |
2m |
3m |
4m |
5m |
6m |
7m |
8m |
9m |
10m |
11m |
12m |
Side 3 meter Side Boiler Version |
361019 |
0 |
2 |
0 |
2 |
4 |
2 |
4 |
6 |
4 |
6 |
8 |
Side 2 meter Side Boiler Version |
361023 |
2 |
0 |
4 |
2 |
0 |
4 |
2 |
0 |
4 |
2 |
0 |
Side 1 meter Side Boiler Version |
361027 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
Floor 3 meter Floor Boiler Version |
361021 |
0 |
1 |
0 |
1 |
2 |
1 |
2 |
3 |
2 |
3 |
4 |
Floor 2 meter Floor Boiler Version |
361025 |
1 |
0 |
2 |
1 |
0 |
2 |
1 |
0 |
2 |
1 |
0 |
Floor 1 meter Floor Boiler Version |
361029 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
Top Rail 3 meter Top Rail Boiler Version |
361010 |
0 |
2 |
0 |
2 |
4 |
2 |
4 |
6 |
4 |
6 |
8 |
Top Rail 2 meter Top Rail Boiler Version |
361022 |
2 |
0 |
4 |
2 |
0 |
4 |
2 |
0 |
4 |
2 |
0 |
Top Rail 1 meter Top Rail Boiler Version |
361026 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
Connecting Frame Boiler Version |
361015 |
2 |
2 |
3 |
3 |
3 |
4 |
4 |
4 |
5 |
5 |
5 |
Telescoping Post Boiler Version |
361014 |
4 |
4 |
6 |
6 |
6 |
8 |
8 |
8 |
10 |
10 |
10 |
End Stirrup Boiler Version |
361011 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
Caster Assembly* |
360065 |
4* |
4* |
4* |
4* |
4* |
4* |
4* |
4* |
4* |
4* |
4* |
Wall Roller Assembly |
360111 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
2 |
Safety Pin Assembly |
360019 |
16 |
16 |
30 |
30 |
30 |
44 |
44 |
44 |
58 |
58 |
|
Adjustable Walk-By Stirrup* |
361030 |
variable* |
End Gate Boiler Version |
361051 |
2* |
2* |
2* |
2* |
2* |
2* |
2* |
2* |
2* |
2* |
2* |
Workcage - 1 meter |
368000-W01 |
|
|
|
|
|
|
|
|
|
|
|
Workcage - 2 meter |
368000-W01 |
|
|
|
|
|
|
|
|
|
|
|
| *Optional Item - not included with Standard Stages |
|